Quote:
Originally Posted by montreal
Including the finishing? Flooring, kitchen, bathroom etc?
|
no,...just the finishing of the exterior and interior block walls ready for paint,and the floors of course are cemented and will be tiled someday in the future.It does include the locations of the pipes and the electrical tubing has been pulled thru some walls.The pipes for water and septic tank have been bought but not installed fully yet,and of course I still have to put in the septic,which will take some more rocks and labor but will do that after the roof is installed.
I just posted this as info on a Dominican house,not one done by developers,builders,etc.This is how most houses are built by the average 6000 peso a month Dominican.
You can see how much profit there is here on these houses built and sold by developers.
bob