View Single Post
  #9  
Old 07-01-2008, 03:16 PM
GALK GALK is offline
Bronze
 
Join Date: Mar 2006
Posts: 85
GALK Level 1 (10)
Default

It is amazing how fast private constuction companies are working when they are authorized to charge the poll as payment.

I used the highway in semana santa (3 month ago), and it took us 2 hours from entrence near Sanchez to Las Americas highway.
A lot was missing and I thought it needs up to end of this year to finish, probably I compared with the usual speed of road construction in the DR.

This shows that everything is possible if the contracts are made in an appropriate way.

GALK
Reply With Quote