View Single Post
  #966  
Old 07-01-2008, 05:44 PM
Fernandez Fernandez is offline
Silver
 
Join Date: Jan 2002
Posts: 216
Fernandez Level 1 (34)
Default

Quote:
Originally Posted by STEVE G. View Post
As planned has to be done this year and how the works are going on the most of it will be done by the end of this summer. It's a concrete and glass type of buildings without many walls and with big windows , so after flooring not really much for them will be left to do , windows , doors etc... , it will be open by the end of this year .
The structure lends itself to a quick finish. The shame is it is rectangular with the front (wide) exposure on the side street facing private townhomes. Never the less, it might be a good location for someone interested establishing a BON / ice cream, smaller retail and perhaps upstairs offices.

Either way, its a start and a positive contribution to the area.
Reply With Quote