  #131  
Old 12-27-2007, 03:25 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

The photos you see posted above of sections of the Metro unfinished are now for the most part tiled and most of the tracks and electronics in place. Some stations are to the point of just waiting for the train to be rolled by...

Some stations are not ready and won't be for the 27 Feb initial date of service.

The tunnel you see is fully done with all tracks laid in already as well as electrical equipment in place. The service and parking terminal is 95% finished and some work is more about internal tooling than anything else...

Some of the train sets parts are already in the DR and the electric escalators are next in the installation line. Otis will be in charge of the actual installation of all elevators as warranty calls for it. All the required elevators are already in the storage buildings waiting for stations to be fitted with the water proofing, and full tests of emergency sump pumps to be done before it gets done.

Fiber optics and L.E.D lighting will be used in critical secondary redundancy systems.

The actual control systems is what's holding much of the work from finalizing, since it needs to be in place before some further systems are placed for some stations to be ready. The company hadn't count with the OPRET's ahead of schedule work in many stations and some systems are being placed in multiple stations to test them, instead of placing all into the stations already 98% ready for placement. In other words, they were not ready with all the systems at hand because work was done way ahead of schedule to OPRET's praise.

I don't see how the system will be ready for Feb 2008... Maybe mid April.

I visited the Alma Mater station back in Sept and later on Nov, to tell you the truth I was shocked with the speed in which things are going!!! Suffices to say you can almost feel the train was going to approach the station any minute at the speed the works are going!!!

I took some photos of the tiled stations but had to erase them as it was a no-no! I was there as a guest of one engineer and we traveled via the tunnel with guards along. The security at the tunnel and stations is almost military like.
Reply With Quote
  #132  
Old 12-30-2007, 02:28 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

Reply With Quote
  #133  
Old 12-30-2007, 02:29 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

Reply With Quote
  #134  
Old 12-30-2007, 02:29 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

Reply With Quote
  #135  
Old 12-30-2007, 02:30 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

Reply With Quote
  #136  
Old 12-30-2007, 02:31 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

Reply With Quote
  #137  
Old 12-30-2007, 02:31 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

Reply With Quote
  #138  
Old 12-30-2007, 02:42 PM
Gold
 
Join Date: May 2003
Posts: 1,481
PICHARDO Level 2 (75)
Default

These are the actual SD Metro cars that already started to make the voyage to the DR after initial systems installations...

You can see the designs on the cars at the side and front. This Metropolis model is the latest and most advanced produced by Alstom. All the required electronics are being installed and tested multiple times to avoid delays at final placement on the rail yards in SD.

The people you see in the picture are reps from the DR "Opret" and Alstom reps.
Reply With Quote
  #139  
Old 12-31-2007, 11:43 AM
Silver
 
Join Date: Oct 2004
Posts: 372
RonS Level 1 (34)
Default

I must admit, the pictures are very impressive, and I won't have any problem admitting I was wrong about this project, if it ends up working and being of benefit to the Dominican people. I'm already amazed that it has been expedited and completion appears to be very close to a being on time.

Do you know the progress of the electrical infrastructure? I understand that the Metro will operate on its own power system. Also, what about staff to operate and maintain the system? Are workers being imported from other countries, or are Dominican being trained?
Reply With Quote
  #140  
Old 12-31-2007, 12:18 PM
Silver
 
Join Date: Dec 2006
Posts: 495
Funnyyale26 Level 1 (11)
Default

I read a few months ago that Dominicans will be /are being trained by the authorities of the Madrid and Chilean metros.
Reply With Quote
Reply

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

The contents of this webpage are copyright © 1996-2008.  DR1. All Rights Reserved.


Content Relevant URLs by vBSEO