Page 33 of 73 FirstFirst ... 23313233343543 ... LastLast
Results 321 to 330 of 725

Thread: Agora mall

  1. #321
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


  2. #322
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


  3. #323
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


  4. #324
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default




  5. #325
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default




  6. #326
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


  7. #327
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


  8. #328
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


  9. #329
    Bronze
    Join Date
    May 2004
    Posts
    1,215
    Post Thanks / Like

    Default

    Quote Originally Posted by PICHARDO View Post
    Architectural Design
    The Mall is built with an eco-friendly concept that
    includes the installation of a large central dome to
    harness sunlight, which will save 20%
    energy.

    It also uses recycled materials and a system of
    water treatment ensures a saving of 35%.

    As explained by the architecture of the project manager,
    Miguel Filpo, this concept of "green building" generates
    an additional investment of 10% compared to a
    conventional construction, but it represents a saving of
    20% in operating costs.

    The design allows for visibility of the premises from
    all levels and includes a commercial anchor (area of
    large store with greater flow of people) in the
    eastern end, and on the opposite side an anchor more for an
    small department store and an financial area.

    This model encourages visitors to move about
    the central area where the are shops small, says Filpo.

    Ágora Mall abrirá en 2012 y se ha rentado en un 95% - Listín Diario Digital




    Even during the construction phases the companies involved and contractors are recycling all the materials left overs, sorting them out to later be shipped to the recycling facilities and the ones not yet recycle in the DR shipped overseas to that aim.

    The Mall is being LEED certified as well!




    Accredited ...
    Project Name City State Country
    AGC office building
    AGORA MALL SANTO DOMINGO DO LEED-CS v2009


    Registered Project Directory
    I would love know as a LEED AP what level of certification this building is looking to acheive... would love to see the list of recycled materials they used and where it came from (mileage wise) and the HVAC calculations for the amount of cfm for the AC. I can already see a few items in the design that could hurt them...

    I think the exterior could be more curb appealing based on the rendering - but what the hell do I know, I'm just a Architect.

  10. Likes waytogo liked this post
  11. #330
    Platinum
    Join Date
    May 2003
    Posts
    10,538
    Post Thanks / Like

    Default


Page 33 of 73 FirstFirst ... 23313233343543 ... LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •